# Capacity Planning & Scaling Document ## Current State Assessment ### System Metrics (as of [Date]) - Current daily active users - Peak requests per second (RPS) - Average response time (p50/p95/p99) - Error rate - Data storage used - Resource utilization (CPU, memory, disk) ### Infrastructure Details - Number of application servers - Database configuration (replicas, shards, etc.) - Cache configuration - CDN/load balancer setup - Region/availability zone setup ## Growth Projections ### Forecasted Growth - User growth rate - Expected peak RPS in 3/6/12 months - Data growth projections - Usage pattern changes expected ### Traffic Patterns - Daily peaks and troughs - Seasonal variations - Special events that cause spikes ## Scaling Limits ### Current Bottlenecks - What limits us today? - Database connection pool - Memory constraints - I/O limitations - External service rate limits - Network bandwidth ### Projected Capacity Headroom - How long until we hit limits (in months)? - When do we need to take action? - Action items and timeline ## Scaling Strategies ### Horizontal Scaling **Application Layer:** - Load balancing strategy - Session management approach - Stateless design requirements - Max number of instances **Database Layer:** - Replication approach - Read replicas strategy - Sharding approach (if needed) - Consistency model **Cache Layer:** - Cache distribution strategy - Eviction policy - Warming strategy ### Vertical Scaling - Current instance size - Available larger instances - When horizontal scaling isn't enough - Cost implications ### Feature-Level Scaling - Feature flags for traffic shaping - Graceful degradation strategies - Circuit breakers - Rate limiting approach ## Infrastructure Upgrades ### Immediate (0-3 months) | Item | Current | Upgrade | Timeline | Cost | |------|---------|---------|----------|------| | [Item 1] | [Current] | [New] | [When] | [Cost] | ### Medium-term (3-6 months) | Item | Current | Upgrade | Timeline | Cost | |------|---------|---------|----------|------| | [Item 1] | [Current] | [New] | [When] | [Cost] | ### Long-term (6-12 months) | Item | Current | Upgrade | Timeline | Cost | |------|---------|---------|----------|------| | [Item 1] | [Current] | [New] | [When] | [Cost] | ## Performance Optimization Opportunities - Low-hanging fruit for improvement - Estimated impact of each optimization - Timeline for implementation ## Cost Implications - Current monthly infrastructure cost - Projected cost increase with growth - Cost optimization strategies - ROI of scaling investments ## Testing & Validation ### Load Testing Plan - How to simulate projected load - Testing methodology - Key metrics to measure - Acceptable failure modes ### Staging Validation - How to test scaling procedures in staging - Frequency of capacity tests - Rollback procedures ## Monitoring & Alarms ### Early Warning Indicators - Metrics that signal capacity issues - Alert thresholds - Action triggers ### Post-Scaling Validation - Metrics to verify scaling was successful - Dashboard updates needed - Communication to stakeholders ## Owner & Review - Owner: [Team/Person] - Last reviewed: [Date] - Next review: [Date] - Previous versions/history: [Links]